Cold Mix Asphalt vs. Hot Mix Asphalt
 
Pothole Patching Cost Comparision

Cold Mix
 
Loose
Aggregate
Hot Mix
Material
$80
$20
$40
Labor
$400
$400
$400
Trucking
$100
$100
$250
Equipment
---
---
$125
Material Waste (25%)
---
---
$40
40 Potholes a day
$580
$520.00
$855
Pot Hole Cost
$14.50
$13..00
$21.40
Life Expectancy
1 year
2 months
1 year
Cost Per Year
to Maintain
$14.50
$78.00
$21.40